The Redmire Project

Pictures supplied by the Friends Of Redmire Station (FORS)

 

Home Latest Infrastructure Along The Line Trains/Rolling Stock Stations Signal Box for Leeming The Redmire Project

Press the 'Home' key at any point to return to the top of this page.

 

Preparing to move the cafe coach into its new location Pictures from 23/2/08

Looking East from the station, this mud pit is where the coach is to go

 

The JCB was used to level the ground before the sleepers were put in place

 

The JCB is still working!

 

Enough sleepers were in place so as to put the rails on them

 

The works train was used to deposit ballast, ready for filling in.

 

With all the sleepers in place, the main line was unscrewed and pushed across.

 

With both lines now slewed over, the track for the coach can be assembled.

Once assembled the coach can be pushed into place, then the job of moving the main running line back can begin. 

 

This coach waits at Redmire for its final movement.

 

 

 

Some pictures of the work being carried out at Redmire station.

 

Excavation for the coach to be parked at Redmire

 

More digging

 

 

 

Painting the platform edge

 

The old signal box fireplace, soon to be buried

 

Looking West at the end of the day

 

 